23.1. Testing of voltage indicators up to 1000 V

23.1.1. Electrical operational testing of voltage indicators up to 1000 V inclusive must be carried out to the extent and in compliance with the following requirements:

Determine the threshold voltage, - which must comply with the requirements of paragraph 8.2.8 of these Rules;

Measure the current flowing through the pointer at the highest operating voltage - which must comply with the requirements of paragraph 8.2.5 of these Rules;

Check the circuit with increased voltage, - which must comply with the requirements of paragraph 8.2.4 of these Rules;

Carry out an insulation test with increased voltage, namely: for single-pole voltage indicators - the insulating case of the indicator along the entire length to the limit stop must be wrapped in foil, leaving a gap of up to 10 mm between the foil and the contact on the end of the case; one wire from the test setup must be connected to the tip contact, and the second, grounded, to the foil; for two-pole voltage indicators - both insulating cases of the indicator must be wrapped with foil, and the connecting wire must be immersed in a vessel with water so that the water covers the wire, not reaching the handles by 9-10 mm; one wire from the test setup must be connected to the tips, and the second, grounded, to the foil and immersed in water, as shown in Figure 2.

The current must be measured using a milliammeter connected in series with a voltage indicator.

23.1.2. When carrying out operational tests of voltage indicators up to 1000 V in order to determine the voltage of the response threshold, check electrical circuit increased voltage, current measurement voltage from the test set must be applied:

To tip contacts

For bipolar voltage indicators;

To the contact tip and the contact on the end (side) part of the housing - for single-pole voltage indicators.

23.2. Testing voltage indicators above 1000 V with a gas discharge lamp

23.2.1. Mechanical tests of voltage indicators above 1000 V with a gas discharge lamp during operation are not carried out.

23.2.2. Electrical performance testing of voltage indicators above 1000 V must be carried out to the extent and in compliance with the following requirements:

Determine the threshold voltage of the pointer, - which must comply with the requirements of paragraph 8.3.4 of these Rules;

Determine the pointer response time - which must comply with the requirements of paragraph 8.1.12 of these Rules;

Test the working part of the indicator with increased voltage, - which (working part) must comply with the requirements of paragraph 8.3.5 of these Rules;

Test the insulating part of the indicator with increased voltage, - which (the insulating part) must comply with the requirements of paragraph 8.3.6 of these Rules.

When checking the indicators, it is necessary to record the voltage values ​​of the response threshold, which must comply with the requirements of paragraph 9.2.3 of these Rules.

23.2.3. When conducting electrical tests of voltage indicators above 1000 V, to determine the response threshold, response time, testing the working and insulating parts of the indicator with increased voltage, the voltage from the test installation must be applied:

To the tip contact and the connection element of the working and insulating parts - for a detachable contact type voltage indicator;

To the tip contact and temporary electrode (conductive bandage) superimposed on the border of the working and insulating parts - for a one-piece voltage indicator.

23.2.4. During the operation of voltage indicators above 1000 V, do not carry out:

Mechanical tests;

Electrical tests of transverse insulation;

Testing of the working part of voltage indicators from 35 to 220 kV.

23.3. Testing voltage indicators for phasing

23.3.1. Electrical operational tests of voltage indicators for phasing must be carried out in the following scope:

Perform a check of pointers according to the schemes of coincidence and counter-connection of phases;

Test the working, insulating parts, as well as the connecting wire with increased voltage.

23.3.2. Electrical performance tests of voltage indicators for phasing should be carried out according to the following schemes:

Phase coincidence, - if both contact electrodes of the indicator are connected to a high-voltage transformer in accordance with Figure 3, a;

Counter switching of phases, - if any of the contact electrodes of the indicator is connected to the transformer terminals in accordance with Figure 3, b;

When checking the indicators, it is necessary to fix the voltage values ​​​​of the response threshold, which must comply with the requirements of paragraph 9.2.3 of these Rules.

23.3.3. When conducting electrical tests of the working and insulating parts of the voltage indicator for phasing, the values ​​​​of the test voltage must be selected in accordance with the requirements of paragraphs 9.2.4 and 9.2.5 of these Rules and applied:

To the contact electrode and to the connection element of the working and insulating parts - in the case of testing the longitudinal insulation of the working parts of the indicator;

To a metal connection and to an electrically conductive bandage applied near the restrictive ring - in the case of testing the longitudinal insulation of the insulating parts of the indicator.

23.3.4. Checking the insulation of the flexible connecting wire of voltage indicators for phasing must be carried out according to the following method:

For pointers up to 20 kV - the connecting wire must be immersed in a bath of water so that the distance between the metal tips of the connection with the pole and the water level in the bath is from 60 to 70 mm, and apply a test voltage to the contact electrode and to the body of the metal bath;

For pointers from 35 to 110 kV - the connecting wire, separately from the pointer, must be immersed in a bath of water so that the water level is 50 mm below the metal lugs, and one of the transformer leads is connected to the metal lugs of the flexible wire, and the other to body of a metal bath or to an electrode immersed in water. The value of the test voltage and the duration of the test of the connecting wire must comply with the requirements of paragraph 9.2.6 of these Rules.

GOST 20493-2001

INTERSTATE STANDARD

VOLTAGE INDICATORS

GENERAL SPECIFICATIONS

INTERSTATE COUNCIL
ON STANDARDIZATION, METROLOGY AND CERTIFICATION
Minsk

Foreword

1 DEVELOPED by the Special Design and Technology Bureau for High-Voltage and Cryogenic Equipment (SKTB VKT) - a branch of OAO Mosenergo

INTRODUCED by Gosstandart of Russia

2 ADOPTED by the Interstate Council for Standardization, Metrology and Certification (Minutes No. 19 dated May 24, 2001)

State name

Name of the national standardization body

The Republic of Azerbaijan

Azgosstandart

Republic of Armenia

Armstate standard

Republic of Belarus

State Standard of the Republic of Belarus

The Republic of Kazakhstan

State Standard of the Republic of Kazakhstan

Republic of Kyrgyzstan

Kyrgyzstandart

The Republic of Moldova

Moldovastandard

Russian Federation

Gosstandart of Russia

The Republic of Tajikistan

Tajikstandart

Turkmenistan

Main State Service "Turkmenstandartlary"

The Republic of Uzbekistan

Uzgosstandart

3 Decree of the State Committee Russian Federation on standardization and metrology dated December 19, 2002 No. 495-st interstate standard GOST 20493-2001 entered into force directly as the state standard of the Russian Federation on January 1, 2004.

4 INSTEAD OF GOST 20493-90

VOLTAGE INDICATORS

General specifications

Voltage detectors.
General specifications

the dateintroductions 2004-01-01

1 area of ​​use

This standard applies to voltage indicators used as the main electrical protective equipment in electrical installations of constant and alternating current voltage up to 1000 V and alternating current electrical installations with voltages over 1000 V up to 220 kV inclusive of industrial frequency of climatic modification UHL category 1.1 according to GOST 15150, operating with direct contact with the current-carrying parts of electrical installations (contact).

The standard does not apply to voltage meters intended for operation in an environment containing conductive dust and aggressive gases of high concentration, as well as voltage meters designed to operate in the rain and during a thunderstorm.

2 Normative references

This standard uses references to the following standards:

For pointers over 1000 V

Bending test

For pointers over 1000 V

Examination electrical resistance charger insulation

For all pointers

Climate test

For all pointers

Mechanical Tests

For all pointers

Note - In the table, the "+" sign means that the tests are being carried out.

7.5 Periodic tests are carried out on voltage indicators that have passed acceptance tests.

7.6 Periodic tests should be carried out at least once every two years on at least 5 samples of voltage indicators.

7.7 Type tests should be carried out on at least 5 samples of voltage indicators.

7.8 During type and periodic tests, all parameters and characteristics established by this standard are checked in accordance with the table . The scope and methods of additional tests should be indicated in the regulatory documents (ND) for the voltage indicator.

7.9 If during type or periodic tests it is found that at least one sample does not comply with the requirements of one of the clauses of this standard, as well as RD, retests are carried out on a double number of samples.

In the event of negative results of repeated tests, the release and sale of the released products is suspended until the causes of the non-compliance are eliminated. Shipment of indicators is resumed only after receiving satisfactory test results.

7.10 The results of periodic and type tests must be documented.

8 Control methods

8.1 Visual control of voltage indicators consists in checking their serviceability, completeness, packaging, marking, the presence of corrosion protection, the condition of the insulating surfaces, the presence of a restrictive ring (stop) and accompanying documents.

8.2 Checking voltage indicators for compliance with the working drawings should be carried out using a measuring tool that provides the accuracy specified in these drawings.

8.3 The roughness of the machined surfaces should be checked with a profilometer or an optical indicator.

Checking the protective coatings of metal parts should be carried out in accordance with GOST 9.302, the rate of voltage rise to 1/3 of the test voltage can be arbitrary. A further increase in voltage should be smooth and fast, but allowing, at a voltage of more than 3/4 of the test voltage, to read the readings of the measuring device. When the required voltage value is reached after exposure for a specified time, it must be quickly reduced to zero or, at a value equal to 1/3 or less than the test value, it must be turned off.

8.6 Climatic testing of voltage indicators is carried out by holding in a climatic chamber for 2 hours at each of the limiting temperatures (minus 45 ° C, plus 40 ° C), followed by checking their performance.

8.7 Checking voltage indicators for resistance to mechanical stress should be carried out according to GOST 16962.2 (Method 104-1) or by transporting signs in a container by car along dirt roads - for a distance of 50 km at an average speed of 20 km/h or on asphalt roads - for a distance of 200 km at an average speed of 50 km/h with subsequent verification their performance.

8.8 Checking the electrical resistance of the insulation of the charger should be carried out according to GOST 2933 . Wherein Charger attach to the voltage indicator, wrap its body with foil, as well as the working and indicator parts of the voltage indicator, connect the contacts of the power plug to each other, and connect a 1000 V megger between one of the contacts and the foil.

If the batteries are charged by removing them from the voltage indicator with subsequent installation in the charger, then the case of the charger with the batteries installed in it is wrapped with foil.

If there is an isolation transformer in the charger, the case is wrapped with foil, to which the contacts of the connector are attached, which serves to connect to the voltage indicator.

8.9 Voltage indicators up to 1000 V

8.9.1 The repetition rate of pulses of light and sound signals check by applying the minimum operating voltage to the contacts - tips of the voltage indicator.

8.9.2 To check the indication voltage and the serviceability of the voltage indicators, the voltage from the test facility is applied to the contacts - tips of the two-pole indicator, to the tip contact and the contact on the body of the single-pole indicator.

8.9.3 Checking the voltage at the contacts - tips of multifunctional voltage indicators in the continuity test mode is carried out using a voltmeter.

8.9.4 The value of the current flowing through the voltage indicator at the highest operating voltage is determined using a milliammeter connected in series with the indicator.

8.9.5 To test the insulation of a two-pole voltage indicator with increased voltage, both cases are wrapped in foil. The foil on both cases is connected with a wire. One terminal of the test set is earthed. The test voltage is applied to the tips of both housings of the voltage indicator. The second (grounded) wire is connected to the foil on the case, and the connecting wire is lowered into a grounded vessel with water so that the water covers it, not reaching the handles 10 mm.

For single-pole voltage indicators, the case is wrapped with foil along the entire length up to the limit stop. One wire from the test set is connected to the tip, and the second (grounded) to the foil.

8.9.6 Voltage indicators should be considered as having passed the tests in the absence of breakdown, overlap on the insulation surface, increase in the values ​​of current and voltage indication above the rated ones. The presence of breakdown, overlap on the surface of the insulation is determined according to the indications measuring instruments and visually.

8.10 Voltage indicators over 1000 V

8.10.1 The time until the first signal appears is measured using a stopwatch. Determination of the time of appearance of the first signal should be carried out first.

8.10.2 Time to the appearance of the first signal and the frequency of the pulses of the light and sound signalfishing is checked by applying the minimum phase operating voltage to the indicator. The distance from the pointer to grounded objects when checking the time of the appearance of the first signal and the pulse frequency must be at least 2 m.

8.10.3 Determining the indication voltage - according to .

8.10.4 When checking the voltage indicator for the absence of indication from the influence of neighboring circuits, voltage is applied to a bus (wire) 2 m long, the indicator is connected to an insulated bus (wire) of the same length, located parallel to the first bus at a distance specified in .

8.10.5 When checking the electrical strength of the working part, the test voltage is applied to the tip contact and points located at distances from each other equal to the smallest distance in the light from current-carrying parts to grounded structures and parts of buildings established by the rules [ ].

8.10.6 When checking the electrical strength of an insulating part, it is allowed to test it in parts. In this case, the insulating part is divided into sections, to which a part of the specified total test voltage is applied, proportional to the length and increased by 20%.

8.10.7 Voltage indicators should be considered as having passed the test in the absence of breakdown, overlapping on the insulation surface, indication from the influence of neighboring circuits, increase in the indication voltage value above the normalized one.

8.10.8 When testing for bending, the stress indicator is installed horizontally and fixed at two points: at the end of the handle and the restrictive ring.

8.10.9 The stress gauges should be considered to have passed the test if the deflection under the action of the mass of the working part, measured at the end, does not exceed 10% of the length involved in the test, and also in the absence of residual deformations, cracks and loosening of fasteners.

9 Transportation and storage

9.1 Transportation of voltage indicators is carried out by any mode of transport in covered vehicles in accordance with the rules for the carriage of goods in force for this type of transport.

9.2 Conditions for storage and transportation of voltage meters in terms of the impact of climatic factors external environment must comply with group 5 according to GOST 15150.

In terms of the impact of mechanical factors, the conditions of transportation must comply with group C in accordance with GOST 23216.

9.3 Storage of pointers should be carried out in a packed form; storage group 2 GOST 15150 in the absence of exposure to acids, alkalis and other aggressive substances, as well as organic solvents.

10 Operating instructions

10.1 The operation of voltage indicators must be carried out in accordance with the rules [ ], [ ] and a passport to a pointer of a specific type.

10.2 Repair of voltage indicators is carried out by specialized enterprises or the manufacturer.

11 manufacturer's warranty

11.1 The manufacturer guarantees the compliance of the voltage indicator with the requirements of this standard, subject to the conditions of storage, operation and transportation.

11.2 Guarantee period operation of the voltage indicator - a year from the date of commissioning.

11.3 The service life of voltage indicators (except for an autonomous power source) is at least five years.

APPENDIX A

(reference)

Bibliography

Rules for the installation of electrical installations. Moscow: Energoatomizdat, 1985

Safety regulations for the operation of electrical installations. Moscow: Energoatomizdat, 1987, approved. Presidium of the Central Committee of Trade Unions of Workers at Power Plants and the Electrical Industry, Office for Safety and Industrial Sanitation of the USSR Ministry of Energy, 1985

Keywords: voltage indicators, specifications

When working with electrical devices, safety is very important. One of the key points is the use of electrical protective equipment, which are objects that protect a person from exposure electric current. At the same time, it is important to know what insulating electrical protective equipment is used in electrical installations and what exactly they are intended for, as well as monitor their condition, including checking and replacing them in time.

What are the means of electrical protection and what are the terms for testing electrical protective equipment, will be discussed in this article.

The safety of work carried out on electrical installations is ensured by several groups of protective equipment.

What applies to electrical protective equipment:

  • electrical protective equipment, the function of which is to prevent electric shock;
  • means for collective and individual operation, protecting against electromagnetic fields and used in installations with a voltage of at least 330 kV;
  • individual protection means.

PPE is designed to prevent a person from falling, damage to the respiratory system, injury to the face, head, hands. This group also includes special suits that protect against electric arcs.

From the action of electromagnetic fields, shielding devices of an individual, as well as a removable and portable type, portable grounding are used as protective objects. This also includes prohibition, warning, index posters and signs.

What means are electrical protective and protect a person from the action of current when working in electrical installations? It:

  • insulating rods and pliers;
  • voltage indicators;
  • fixed and mobile devices and instruments indicating the presence of voltage;
  • devices for safe measurements and tests;
  • gloves, galoshes, rugs and coasters made of materials with dielectric properties;
  • shields or screens;
  • caps, covers and linings;
  • individual tools with insulation (screwdrivers, pliers, etc.);
  • ladders and ladders made of non-conductive material;
  • posters and other warning, prohibition and guidance signs.

All insulating electrical protective equipment, depending on the degree of protection, is divided into two subgroups.

Basic and additional electrical protective equipment

The classification of electrical protective equipment involves dividing them into basic and additional.

The main electrical protective equipment includes those that provide a high degree electrical protection and allow touching and working on live parts. It follows from this which insulating protective equipment is additional: they are used only in conjunction with the first category, since they cannot provide long-term and complete protection against the action of electric current.

All funds are numbered and registered and periodically subjected to inspection and/or verification.

Depending on the voltage threshold that may be in the electrical installation, both categories are divided into 2 sections.

List of electrical protective equipment:

Basic insulating electrical protective equipment Additional insulating electrical protective equipment
Electrical protective equipment in electrical installations up to 1000 V
any insulating rods galoshes and boots
isolation pliers carpets and coasters made of dielectrics
indicators of the presence and magnitude of voltage caps, covers and linings insulating against current
clamps for measuring electricity ladders and ladders
dielectric gloves
individual tool with non-conductive handles
For installations with voltages above 1000 V
capacitive and non-contact voltage indicators, for phasing boots and gloves made of dielectric material
isolation pliers carpets and coasters
insulating rods ladders and ladders
clamps for measuring current caps and covers for insulation
shielding devices for personal protection voltage signaling devices
protective devices for work under voltage

Produced by qualified specialists using a special installation. This is a difficult process that requires certain skills. How to safely test dielectric gloves, read our separate article.

Rubber gloves are diverse in material and purpose. For example, and rubber gloves will be very different.

Checking and testing terms of dielectric protective equipment

An item used for electrical protection must necessarily have a special stamp, which indicates the following parameters:

  • title;
  • manufacturer;
  • date of manufacture;
  • test period.

The last parameter is so important that in the absence of it or the end of the verification action, it is forbidden to use the tools in the work. The use of this electrical protection is a violation of safety regulations, risk-bearing for life.

The first test of electrical protective equipment is carried out after the production of the product, subsequent - after certain periods. The terms for testing electrical protective equipment are specified in GOST and TU. The same documents prescribe the conditions and time of test work, as well as the frequency of inspections, which are usually carried out more often and can be either self-diagnosis or a preliminary stage of verification. The assessment of the mechanical and electrical qualities of protective equipment is usually carried out in specialized organizations.

Below is a table that indicates the frequency of testing electrical protective equipment.

Terms of checking dielectric protective equipment Product type Frequency of inspections
Every six months Dielectric gloves Before each use
Ladders and ladders Semiannually
Protective equipment for live repairs
Every year Voltage indicators (up to 1 kV and above 1 kV with gas discharge lamp and phasing)
Insulating part of the cable piercing device
Insulating caps and covers
Galoshes and boots made of dielectric material
Hand tools with handles made of insulating material
Once a quarter, but at least once a year Measuring rod and its parts Once a quarter
Every 2 years Insulating rods Every year
Insulating pliers Every six months
Clamps for measuring current Semiannually
Non-contact voltage indicators over 1 kV Before use
Insulating pads hard and rubber Once a year
Every 3 years Bots Semiannually
Rubber caps

Mats and coasters are not tested, but inspection is standardized for them once a year or once every 2 years, respectively. In general, a visual check of dielectric protective equipment, which includes rugs, boots, galoshes, gloves, boots, is usually carried out before each use in order to detect a violation of the integrity of the coating.

If defects were found during inspection or testing, then insulating electrical protective equipment cannot be used.


    1. To check the presence or absence of voltage in electrical installations up to 1000 V, two types of indicators are used:

  • bipolar - working with the flow of active current;

  • single-pole - operating with capacitive current.

    1. Two-pole pointers are designed for electrical installations of alternating and direct current, and single-pole - for electrical installations of alternating current.

    2. Two-pole pointers consist of two housings containing elements of the electrical circuit. The elements of the electrical circuit are interconnected by a flexible wire that does not lose elasticity at low temperatures, at least 1 m long.

    3. The electrical circuit of a two-pole pointer with visual indication may contain a pointer-type device or a digital sign-synthesizing system (with a small-sized power supply for the indicating scale). Pointers of this type can be used for voltages from 0 to 1000 V.

    4. The electrical circuit of a single-pole voltage indicator must contain an indication element with an additional resistor, a tip contact and a contact on the end (side) part of the housing, with which the operator's hand comes into contact.

    5. The length of the uninsulated part of the contacts - tips should not exceed 5 mm. Tip contacts must be rigidly fixed and must not move along the axis.

    6. Operational tests of voltage indicators up to 1000 V consist in determining the indication voltage, checking the circuit with increased voltage, measuring the current flowing through the indicator at the highest operating voltage, and testing insulation with increased voltage.

    7. To check the indication voltage for a two-pole pointer, the voltage from the test setup is applied to the contacts - tips, for a single-pole pointer - to the contact - tip and the contact on the end (side) part of the housing.

    8. The indication voltage of voltage indicators up to 1000 V should not exceed 50 V.

    9. To check the circuit for a two-pole pointer, the voltage from the test setup is applied to the contacts - tips, for a single-pole pointer - to the contact - tip and the contact on the end (side) part in accordance with the diagrams in Fig. 5.

    10. The test voltage when checking the circuit must exceed the highest value of the operating voltage by at least 10%. The duration of the test is 1 minute.

    11. The value of the current flowing through the pointer when highest value operating voltage must not exceed:

  • 0.6 mA for a single-pole voltage indicator;

  • 10 mA for a two-pole voltage indicator with elements providing visual or visual-acoustic signal indication;

  • for voltage indicators with an incandescent lamp up to 10 W with a voltage of 220 V, the current value is determined by the power of the lamp.

    1. The current value is measured using an ammeter connected in series with the pointer in accordance with the diagram in fig. 6.

    2. To test the insulation of voltage indicators with increased voltage for two-pole indicators, both insulating cases are wrapped in foil, and the connecting wire is lowered into a grounded vessel so that water closes the wire, not reaching the handle by 9 - 10 mm. One wire from the test setup is connected to the contacts - tips, the second, grounded, to the foil and lowered into the water in accordance with Fig. 7.

    3. For single-pole voltage indicators, the insulating housing is wrapped with foil along the entire length up to the limit stop. A gap of at least 10 mm is left between the foil and the contact on the end of the housing. One wire from the test setup is connected to the contact - the tip, the second, grounded - to the foil.

    4. The insulation of voltage indicators up to 500 V must withstand a voltage of 1 kV, and voltage indicators above 500 V - 2 kV. The duration of the test is 1 minute.

Rice. 5 Schemes for testing a single-pole voltage indicator up to 1 kV.

Rice. 6 Test schemes for a two-pole voltage indicator up to 1 kV.

Rice. 7 Schemes for testing the insulation of a two-pole voltage indicator up to 1 kV.


  1. Voltage indicators for phase matching

    1. Pointers are designed to check the phase coincidence on overhead and cable lines, transformers and other electrical installations from 3 to 110 kV.

    2. Pointers are two-pole devices of the light-signal type, operating in direct contact with live parts of electrical installations under voltage.

    3. Pointers consist of two tubular cases made of electrically insulating material containing working, insulating parts and handles. Elements of the electrical circuit (contact electrodes, gas discharge indicator lamp and related electronic components) are mounted in the working parts of the indicator itself and the tube with additional resistance, connected by a flexible wire with reinforced insulation. A tube with additional resistance is arranged in the same way as a conventional voltage indicator, but instead of a capacitor and discharge lamp heat-resistant resistors are inserted inside.

    4. The design of the working parts of the indicators should exclude the possibility of breakdown and flashover with simultaneous contact with current-carrying and grounded parts of electrical installations.

    5. During operational tests, the indicators are checked according to the schemes of consonant and counter switching, the electrical strength of the working and insulating parts and the connecting wire is checked.

    6. When checking the indicator according to the consonant switching circuit, both contact electrodes are connected to the high-voltage output of the transformer according to the circuit in fig. eight.

    7. When checking the indicator according to the circuit of counter-connection, one of the contact electrodes is connected to the high-voltage terminal of the transformer, and the second to the grounded terminal of the transformer according to the scheme of Fig. 9.

    8. During the test, the indicator voltage is fixed, the values ​​​​of which, depending on the circuit, are given in Table 3.
Table 3

    1. When checking the electrical strength of the longitudinal insulation of the working parts, the test voltage is applied to the contact electrode and the threaded connector element for 1 minute. Tests are made according to the scheme of fig. 2.

    2. In this case, the test voltages must have the following values:

  • 12 kV - for an indicator with voltage up to 10 kV;

  • 70 kV - for an indicator with a voltage of 35 kV;

  • 100 kV - for an indicator with a voltage of 110 kV.

    1. When checking the electrical strength of the longitudinal insulation of the insulating parts, the test voltage is applied for 5 minutes to the metal connector and the wire bandage applied at the restrictive ring. Tests are made according to the scheme of fig. 3.

    2. In this case, the test voltages must have the following values:

  • 40 kV - for an indicator with voltage up to 10 kV;

  • 105 kV - for an indicator with a voltage of 35 kV;

  • 190 kV - for an indicator with a voltage of 110 kV.

    1. A flexible wire is tested with a voltage of 20 kV for 1 minute for indicators up to 20 kV, for indicators of 35-110 kV - 50 kV for 1 minute.

    2. The wire is lowered into a bath of water so that the distance between the wire termination point and the water level is within 60-70 mm for indicators up to 20 kV and 160-180 mm for indicators up to 35-110 kV. Voltage is applied to a contact electrode immersed in water.

    3. In operation, mechanical tests of pointers are not carried out.

Rice. 8 Scheme of consonant inclusion of the voltage indicator.

Rice. 9 Scheme of counter switching on the voltage indicator.

Rice. 10 Scheme of testing the connecting wire of the voltage indicator.


  1. Cable puncture devices

    1. Cable piercing devices are designed to indicate the absence of voltage on the repaired cable up to 10 kV before cutting it by piercing the cable along the diameter and shorting all the conductors of different phases to each other and to the ground.

    2. The devices include a working body, a grounding device, an insulating rod and a drive.

    3. The grounding device includes a grounding rod with a grounding conductor and clamps.

    4. The length of the insulating part of the device must be at least 230 mm.

    5. The cross section of the ground contact must be at least 25 mm².

    6. During operational tests, the operability of the device is checked by puncturing a sample of the ABASHV 3 x 240 type cable, and in mechanical type puncture devices, in addition, the force applied to the drive belt is measured.

    7. During operational tests, the insulating parts of the devices (insulating rod or insulating insert of the electric drive) are tested with an increased voltage of 40 kV for 5 minutes.

    8. The test voltage is applied to the insulating part of the rod or to the metal flange of the electric drive and a special terminal.

  1. Dielectric rubber gloves

    1. Gloves are designed to protect hands from electric shock when working in electrical installations up to 1000 V as the main electrical protective equipment, and in electrical installations above 1000 V - as an additional one.

    2. In electrical installations, it is allowed to use only gloves marked with protective properties EN (for protection against electric current with voltage up to 1000 V), EV (for protection against electric current with voltage above 1000 V).

    3. The length of the gloves must be at least 350 mm.

    4. In operation, only electrical testing of gloves is carried out.

    5. Once every 6 months, gloves must be tested with an increased voltage of 6 kV for 1 minute, the current through the glove should not exceed 6 mA.


    6. When testing, dielectric gloves are immersed in a metal vessel with water at a temperature of 25 + 10 ° C, which is also poured into these products. The water level both outside and inside the products must be 50 mm below the top edge of the gloves.

    7. The protruding edges of the gloves must be dry. One terminal of the test transformer is connected to the vessel, the other is grounded. An electrode connected to ground through a milliammeter is lowered inside the gloves. The product is rejected if the current passing through it exceeds the norm or sharp fluctuations of the milliammeter needle occur.

    8. In the event of a breakdown, the defective product or the entire installation is turned off.


Fig.11. circuit diagram testing of dielectric gloves, overshoes and galoshes.


  1. Boots, rubber dielectric galoshes

    1. Special dielectric footwear (glued overshoes, rubber glued or shaped boots in tropical design) is an additional electrical protective equipment when working in closed, and in the absence of precipitation - in open electrical installations. In addition, dielectric boots and galoshes protect workers from step voltage.

    2. Shoes are used:

  • galoshes - at voltages up to 1000 V;

  • boots - at all voltages.

    1. According to the protective properties of shoes denote:

  • En - rubber glued galoshes;

  • Ev - rubber glued and molded boots.

    1. The height of the bot must be at least 160 mm.

    2. In operation, dielectric galoshes are tested with a voltage of 3.5 kV, and boots with a voltage of 15 kV for 1 minute. The currents flowing through the products should be no more than 2 mA for galoshes and 7.5 mA for boots.

    3. When testing, the water level both outside and inside horizontally installed products should be 20 mm below the sides of the galoshes and 50 mm below the edge of the lowered lapels of the boots.

    4. Tests are carried out according to the scheme of Fig. eleven.

    5. At the end of the tests, the products are dried.

  1. Dielectric rubber carpets and insulating pads

    1. Dielectric rubber carpets and insulating stands are used as additional electrical protective equipment in electrical installations up to and above 1000V.

    2. Carpets are used in closed electrical installations of all voltages, except for particularly damp rooms, and in open electrical installations in dry weather.

    3. Stands are used in damp and polluted rooms.

    4. Carpets are manufactured in accordance with the requirements of GOST 4997-75, depending on the purpose and operating conditions of the following two groups:

  • 1st group - normal performance;

  • 2nd group - oil and petrol resistant.

    1. Carpets (recommended to use at least 50 x 100 cm) are made in the following sizes:

  • length from 500 to 1000 mm;

  • over 1000 to 8000 mm;

  • width from 500 to 1200 mm;

  • 6 + 1 mm thick.

    1. Carpets must have a corrugated front surface and be of one color.

    2. The insulating support consists of a flooring fixed on support insulators with a height of at least 70 mm. It is recommended to use insulators of the CH-6 type, produced specifically for the manufacture of stands.

    3. Flooring with a size of at least 500 x 500 mm should be made of wooden planks without knots and slant, planed from well-dried wood. The gaps between the bars should not exceed 30 mm. Solid decks are not recommended, as they make it difficult to check that there is no accidental shunting of the insulators. The flooring must be painted on all sides.

    4. Insulating supports must be strong and stable. In the case of using removable insulators, their connection to the flooring must exclude the possibility of slipping of the flooring. To eliminate the possibility of overturning of the insulating support, the edges of the flooring should not protrude beyond the supporting surface of the insulators.

    5. In operation, carpets and coasters are not tested. They are rejected during inspections. Carpets should be cleaned of dirt and inspected at least once every 6 months. If defects are found in the form of punctures, tears, cracks, etc. they should be replaced with new ones.

    6. The supports are inspected once every 3 years for the absence of violations of the integrity of the support insulators, kinks, weakening of the connection between the individual parts of the flooring. If these defects are found, they are rejected, and after the defects are eliminated, they are tested according to the standards of acceptance tests.

SO 153-34.03.603-2003 p. Appendix 7 Appendix 7

Norms and terms of operational electrical testing of protective equipment

Test frequency
Voltage indicators up to 1000 V 1 time in 12 months.
- body insulation Up to 0.5 -
Above 0.5 to 1 -
- high voltage test:
- single-pole Up to 1 1.1 Uwork. naib -
- bipolar Up to 1 1.1 Uwork. naib -
- checking the current through the pointer:
single-pole Up to 1 Uwork naib - 0,6
bipolar*2 Up to 1 Uwork naib -
- voltage Up to 1 Not higher than 0.05 - -
indications

With what frequency should electrical tests of voltage indicators be carried out to check the coincidence of phases?

Once every 6 months
Once every 12 months
Once every 24 months
Once every 36 months

SO 153-34.03.603-2003 p. Appendix 7

Name of protective equipment Electrical installation voltage, kV Test voltage, kV Test duration, min. Current flowing through the product, mA, no more Test frequency
Voltage indicators for checking phase matching: 1 time in 12 months.
- insulating To 10 -
part Above 10 to 20 -
-
-
- working part To 10 -
-
-
-
-
- indication voltage:
according to the consonant scheme Not less than 7.6 - -
inclusion Not less than 12.7 - -
At least 20 - -
At least 28 - -
At least 40 - -
At least 100 - -
according to the scheme Not higher than 1.5 - -
oncoming Not higher than 2.5 - -
inclusion Not higher than 3.5 - -
Not higher than 5 - -
Not higher than 17 - -
Not higher than 50 - -
- connecting up to 20 - -
the wire 35-110 - -

How often should electrical tests of electrical clamps be carried out?



How often should electrical testing of cable piercing devices be carried out?

TICKET 9

How often should electrical tests of dielectric gloves be carried out?

How often should electrical tests be carried out on dielectric bots?

How often should electrical tests of dielectric linings be carried out?

Once every 6 months
Once every 12 months
Once every 24 months
Once every 36 months

SO 153-34.03.603-2003 p. Appendix 7 Norms and terms of operational electrical testing of protective equipment

Name of protective equipment Electrical installation voltage, kV Test voltage, kV Test duration, min. Current flowing through the product, mA, no more Test frequency
Insulating pads: 1 time in 24 months
- hard Up to 0.5 -
Above 0.5 to 1 -
Above 1 to 10 -
-
-
- flexible out Up to 0.5
polymer materials Above 0.5 to 1

Which document indicates the number of the protocol for testing protective equipment?

SO 153-34.03.603-2003 p. Appendix 1

What is the duration of the test voltage application for flexible insulating linings for work under voltage in electrical installations up to 1000 V?

5 minutes
1 minute
3 minutes